Skip to content

AMARCON JAYA UTAMA

Mechanical, Electrical, HVAC, Piping Instalation Contruction & Civil Work

  • HOME
  • CORPORATE
    • Organisation Structure
    • Our Project
    • Our Customer
  • SERVICE
    • Mechanical
    • Electrical
    • Air Conditioning
    • Piping Instalation
    • Civil Works
  • CONTACT US
Uncategorized

Replacement Exhaust Fan

ByadminAJU

Unit Lama Proses Bongkar Unit Lama Pemasangan Unit Baru Name Project : Replacement Exhaust Fan Trashroom Plaza SenayanDate Project : … More Replacement Exhaust Fan →

Replacement Exhaust FanJanuary 14, 2025 0No comments on Replacement Exhaust Fan
Uncategorized

Installation Split Duct 20 PK

ByadminAJU

Installation Unit Indoor 1 & 2 Installation Unit Outdoor 1 & 2 Installation Ducting Installation Pipe Refrigerant Filling Pipe Refrigerant … More Installation Split Duct 20 PK →

Installation Split Duct 20 PKJanuary 14, 2025 0No comments on Installation Split Duct 20 PK
Mechanical

Relokasi Mesin Furnace DOWA at KIIC Karawang

ByadminAJU

Pada project ini, PT. Amarcon Jaya Utama diberi kepercayaan oleh client kami untuk melakukan relokasi mesin furnace, dalam project ini … More Relokasi Mesin Furnace DOWA at KIIC Karawang →

Relokasi Mesin Furnace DOWA at KIIC KarawangDecember 19, 2023 0No comments on Relokasi Mesin Furnace DOWA at KIIC Karawang
Mechanical

Water Clarifier Installation

ByadminAJU
Water Clarifier InstallationDecember 4, 2020 0No comments on Water Clarifier Installation
Mechanical

Leveling, Installation Conveyor Machine at Tambun Factory

ByadminAJU
Leveling, Installation Conveyor Machine at Tambun FactoryJanuary 15, 2020 0No comments on Leveling, Installation Conveyor Machine at Tambun Factory
Piping Installation

Installation offshore HDPE Pipe at RIAU

ByadminAJU

Name Project : INSTALLATION PIPE HDPE at PT. RIAU ANDALAN PULP & PAPER Owner : PT. Riau Andalan Pulp & … More Installation offshore HDPE Pipe at RIAU →

Installation offshore HDPE Pipe at RIAUApril 15, 2019 0No comments on Installation offshore HDPE Pipe at RIAU
CORPORATE, Uncategorized

Painting of Wall Factory & ACP Installation at Factory Office

ByadminAJU

Name Project : PAINTING OF WALL FACTORY AND ACP INSTALLATION at PT. FRAMAS INDONESIA Owner : PT. Framas Indonesia PIC … More Painting of Wall Factory & ACP Installation at Factory Office →

Painting of Wall Factory & ACP Installation at Factory OfficeApril 15, 2019 0No comments on Painting of Wall Factory & ACP Installation at Factory Office
Mechanical

Turbine Foundation Work at PLTU Lampung

ByadminAJU

Name Project : Turbine Foundation Work at PLTU Sebalang Lampung Owner : PT. Sulzer Indonesia PIC Project : Mr. Jonas … More Turbine Foundation Work at PLTU Lampung →

Turbine Foundation Work at PLTU LampungApril 15, 2019 0No comments on Turbine Foundation Work at PLTU Lampung
Mechanical

Overhaul Evaporator Coil AHU at Mall Senayan Jakarta

ByadminAJU

Name Project : OVERHOUL EVAPORATOR COIL AHU 2nd Floor – 17th Floor at Sentral Senayan I Owner : PT. Senayan … More Overhaul Evaporator Coil AHU at Mall Senayan Jakarta →

Overhaul Evaporator Coil AHU at Mall Senayan JakartaApril 15, 2019 0No comments on Overhaul Evaporator Coil AHU at Mall Senayan Jakarta
Uncategorized

Machine Relocation include Piping & Electrical Work at Factory Karawang

ByadminAJU

  Name Project : RELOCATION MACHINE include PIPING & ELECTRICAL WORKS at PT. KANETA INDONESIA Owner : PT. Dowa Thermotech … More Machine Relocation include Piping & Electrical Work at Factory Karawang →

Machine Relocation include Piping & Electrical Work at Factory KarawangApril 15, 2019 0No comments on Machine Relocation include Piping & Electrical Work at Factory Karawang

Posts navigation

Older articles
Newer articles

Recent Posts

  • Instalasi Heat Exchanger
  • Project Pipa Hubless
  • Instalasi Water Cooled Chiller 250TR
  • Erection and Assembling Product Pepsico
  • Replacement Isolation Pipe CHWS

Archives

  • April 2026
  • January 2025
  • December 2023
  • December 2020
  • January 2020
  • April 2019
  • January 2018
  • December 2016

Recent Posts

  • Instalasi Heat Exchanger
  • Project Pipa Hubless
  • Instalasi Water Cooled Chiller 250TR
  • Erection and Assembling Product Pepsico
  • Replacement Isolation Pipe CHWS

Recent Comments

    Archives

    • April 2026
    • January 2025
    • December 2023
    • December 2020
    • January 2020
    • April 2019
    • January 2018
    • December 2016
    April 2026
    M T W T F S S
     12345
    6789101112
    13141516171819
    20212223242526
    27282930  
    « Jan    

    OUR OFFICE

    AMARCON JAYA UTAMA Proudly powered by WordPress